Project Management
Model Question Paper
Section A - 1 Mark
1 Various parameters that affect the project in its planning and formulation refers to
a) Project cost
b) Process
c) Resource
d) Project Scope
2 That which is responsible for changing the input and giving a desired output is a
a) Project cost
b) Process
c) Resource
d) Project Scope
3 That which formalizes acceptance and brings project to an orderly end is a
a) control process
b) planning process
c) executing process
d) closing process
4 During the course of executing the project, it is seen that the ______ requirement increases
from start to an intermediate stage of the project.
a) equipment
b) resource
c) design
d) manpower
5 The _____ the project can be estimated based upon the normal distribution curve.
a) manpower requirement of
b) funds requirement of
c) probability of completion of
d) design requirement of
6     The project during the course of its progress may be subjected to _____ because of some 
      external factors. 
      a) changes 
      b) errors 
      c) pressure 
      d) threats 
7      Responsiveness refers to ___ of response of an individual. 
      a) effect 
      b) reduction 
      c) quickness 
      d) increase 
8     ___ is the master key of today’s business. 
      a) project 
      b) risk 
      c) time 
      d) information 
9      Project mindset lays emphasis on flexible ___. 
      a) people 
      b) timings 
      c) resources 
      d) processes 
10    The communication requirement and capabilities in which managers may lack enthusiasm for 
      change and fail to collaborate or practice teamwork with their peers refers to ___. 
      a) communication frequency 
      b) response profiles 
      c) behavior pattern 
      d) barriers to communication 
11    Allow information, questions, comments and opinions to travel through the organization is an 
      essential characteristic of a typical _____ network. 
      a) communication 
      b) neural 
      c) information 
      d) organization 
12    Overcoming barriers to communication associated with differing perceptions of the recipients in 
      different divisions location or parts of a unit, is an essential characteristics of a typical _____ 
      network. 
      a) neural 
      b) communication 
      c) information 
      d) organization 
13    PR stands for _____________ . 
      a) Project  Review 
      b) Performance  Review 
      c) Planning Review 
      d) Procurement Review 
14    _____________ of the organization should be the navigator for the project. 
      a) Manager 
      b) CEO 
      c) Strategy 
      d) Policy 
15    POR helps in ___________ of resources. 
      a) allocation 
      b) minimization 
      c) maximization 
      d) optimization 
16    It is entrusted to a smaller team within a team for initiating, implementing, analyzing and 
      distributing the process. 
      a) CNC 
      b) ISO 
      c) SEI-CMM 
      d) CBPI 
17    The project manager should take the assistance of a__________ and run checks as frequently 
      as possible. 
      a) system administrator 
      b) coordinator 
      c) CEO 
      d) Project Team 
18    It is concerned with integration. 
      a) PCMM 
      b) CMMI 
      c) PMI 
      d) ISO 
19    Performance closer or beyond expectation is the degree of _________. 
      a) assurance 
      b) error 
      c) precision 
      d) quality 
20    ________helps in resetting the goals when they cannot be achieved for various reasons – 
      shortage of resources, time etc. 
      a) Plan 
      b) Guidelines 
      c) Review 
      d) Analysis 
21    _________ is the process by which employees are encouraged to take decisions pertaining to 
      their area of work. 
      a) Automation 
      b) Empowerment 
      c) Authorization 
      d) Delegation 
22    A system of internal _______ gets initiated almost automatically resulting in highly efficient 
      organization as a whole. 
      a)  Auditing 
      b)  Verification 
      c)  Validation 
      d)  Benchmarking 
23    One of the rules which would help organization to be strong in R&D is to ensure 
      _____________ for critical systems and technologies. 
      a)  Completeness 
      b)  Satisfaction 
      c)  Redundancy 
      d)  Perfection 
24    One of the rules which would help organization to be strong in R&D is to build __________ into 
      every activity. 
      a)  Concurrency 
      b)  Modules 
      c)  Redundancy 
      d)  Functions 
25    Change is achieved by making _________changes. 
      a)  Small 
      b)  Big 
      c)  Incremental 
      d) Detrimental 
26    The principle of continuous improvement is seen in _____. 
      a) PM 
      b) PMIS 
      c) ERP 
      d) TQM 
27     _________ Money has to be kept to the minimum for achieving total economy. 
      a) Public 
      b) Overall 
      c) Inventory costs 
      d) Investment 
28    ___   provides a life-cycle review process from system inception to retirement, and a correlation 
      process between the CPIC processes and Enterprise Architecture processes i.e., Departmental 
      Information Architecture, as well as other significant Departmental programs and projects. 
      a) project management information system 
      b) project management control system 
      c) project management enterprise system 
      d) project management review process 
29    ______performs day to day project management, develop project deliverables, prepare project 
      management review and senior management review presentations, present project status, 
      manage resolution of project issues. 
      a) CFO 
      b) CIO 
      c) Project managers 
      d) Program managers 
30    ______review and comment on project deliverables and work products, schedule and support 
      the review meetings, provide support to systems owners and project managers, advise the CIO 
      and associate CIO’s 
      a) CMIP program staff 
      b) Systems owners 
      c) CMIP coordinator 
      d) Program managers 
31    Risk management is ______ for projects, and can help reduce your costs and efforts when 
      trouble strikes. 
      a) helpful 
      b) essential 
      c) insurance 
      d) beneficial 
32    Projects smaller than 12 people - months take about _____ minutes. 
      a) 30-50 min 
      b) 40- 60 min 
      c) 50-70 min 
      d) 60-80min 
33    In ________ a study is done to analyze the changes in the variable values because of a change 
      in one or more of the decision criteria. 
      a) product analysis 
      b) item analysis 
       c) trend analysis 
       d) sensitivity analysis 
34     One of the supply chain management group taking care of documentation systems Is ____                       . 
       a) Odette 
       b) Darwin 
       c) Microsoft 
       d) Pilin 
35     The three levels of SMCo documentation are Work package,  ____ and sub process. 
       a) formats 
       b) procedures 
       c) process 
       d) tables 
36     The level -0 of the SCMo documentation contains _______ . 
       a) sub process 
       b) work package 
       c) process 
       d) measurement 
37     The ______ navigation is the navigation on different levels. 
       a) Horizontal 
       b) Vertical 
       c) Hierarchical 
       d) Sequential 
38     __________ is a quick project status reporting tool. 
       a) Dashboard 
       b) Pie Chart 
       c) Bar Chart 
       d) Trend 
39     One of the features of project scoping is to increase the ____ of the update process. 
       a) linkage 
       b) facility 
      c) interface 
      d) intelligence 
40    The Television Media Control System is required by a Media Solutions Company in Germany 
      who is an Intermediary between a Television Content Development Studio Company and a 
      ____ Company. 
      a)  Pharmaceutical products 
      b)  Automobile accessories 
      c)  TV Broadcasting 
      d) Channer management 
                                          Section B - 2 Marks 
1     During this phase document the lessons from the project. 
      a) Post completion analysis phase 
      b)  Inspecting, testing and delivery phase 
      c) Marketing phase 
      d)  Analysis phase 
2     During inspecting, _____ and _____ phase the project team performs quality control work. 
      a) Marketing   and testing 
      b)  Testing and delivery 
      c) Execution and selling 
      d)  Analysis  and delivery 
3     Any project is undertaken to deliver either _____ or _____. 
      a)  Item , product 
      b)  Service , product 
      c) Item , service 
      d) Report, service 
4     Developing a risk management plan, focusing on the highest prioritized risks requires a ___ of 
      the risk probability and the risk consequences. 
      a) Qualitative assessment 
      b)  Quantitative assessment 
      c) Minimal assessment 
      d) Maximum assessment 
5     A weekly status report includes the following : 
      a) Accomplishments during the period, items not completed, proposed activities, predicted 
      slippage, predicted cost. 
      b) Problems faced, items not completed, proposed activities, predicted slippage, predicted cost. 
      c) Accomplishments during the period, problems and risks, proposed activities, predicted 
      slippage, predicted cost. 
      d) Accomplishments during the period, items not completed, risks, predicted cost. 
6     The ____ and _____ of an individual or an organization are proportional to its capability of 
      evolving processes and structure for superior responsiveness time constant. 
      a) performance and utility 
       b) strength and behavior 
      c) vibrancy and liveliness 
      d) strength and weakness 
7      It is a process through which a project team passes on the details of any system as 
       recommendation for standardization. 
      a) force field analysis 
       b) information risk management 
      c) management assurance measure 
      d) continuous business process improvement 
8      It is a task performed by the project leader to balance efforts to convince management against 
      wavering with efforts to prepare team members to counter any unexpected storms in the 
       project. 
      a) force field analysis 
       b) information risk management 
      c) management assurance measure 
      d) continuous business process improvement 
9     Plan of Record should be prepared for the ______ and ______ used in the Projects. 
      a) Process, Tools 
      b) Task list, check list 
      c) Blue print, master plan 
      d) Techniques, instruments 
10    __________ and ___________ are measures in relation to zero defects and overall Team 
      Performance, the type of activities which can be performed only by the executives and 
      managers. 
      a) managerial , executive productivity 
      b) Team building , performance appraisal 
      c) Utility , performance 
      d) Creativity , Innovation 
11    What can be found out by assigning a suitable weight age to the most likely time estimate in 
      PERT analysis? 
      a) average 
      b) standard deviation 
      c) skewness 
      d) variance 
12    Data have repositories which are accessible, __________ and _________ instantly and used by all 
      concerned. 
      a) transferable and updatable 
      b) secured and convertible 
      c) modifiable and transferable 
      d) retrievable and storable 
13    Modern organizations in all fields depend on technology to improve their processes to deliver the 
      best _________ and _________ to their customers. 
      a) product and services 
      b) technology and goods 
      c) performance and results 
      d) results and satisfaction 
14    Economies are effected when the consumption of _______, ______, movement and time are 
      reduced. 
      a) Money, material 
      b) Power, material 
      c) About, money 
      d) Labor, skills 
15    The standard set of project management reporting requirements fits into the following categories: 
      a) general project overview, project status, product status, issues & risks, project unique 
      information 
      b) project status, product status, issues & risks, project unique information, product price 
      c) general project overview, project status, product status, product price,     project unique 
      information 
      d) general project overview, project status, product status, issues and risks, product price 
16    The two things to manage the risk are to take actions to _______ the likelihood of the risk 
       occurring and take action to reduce the _______ if the risk does occur. 
       a) reduce, impact 
       b) understand, effect 
       c) analyze, complications 
       d) study, damages 
17     The Process Chain describes a process based on the ________ as well as the ________. 
       a) chronological, logical interdependencies 
       b) product cycle, process cycle 
       c) product characteristics, price 
       d) supply chain, monitoring characteristics 
18     The section on operations and manufacturing deals with the customer focus, outsourcing issues, 
       primary metrics, quality , costs, delivery, core in manufacturing, and ___________ . 
       a) unique services 
       b) unique capabilities 
       c) storage 
       d) utility 
19     Key features of GDM are standardization, modularization, ________ and ________. 
       a) customization, micro structure 
       b) customization, macro structure 
       c) normalization, minimization, 
       d) generalization, globalization 
20     Vendor can recommend suitable technology wherein the prevailing back end systems are ____ 
       and ____. 
       a) Turbo, DOS 
       b) Borland, Windows 
       c) Borland, Linux 
       d) Turbo, OS2 
                                         Section C –4 Marks 
1     In the connection between various process groups , loop exists between _____ 
      a) planning process, initiating process and closing process 
      b) controlling process, executing process, planning process 
      c) executing process, closing process, initiation process 
      d) initiating process, planning process, executing process 
2     Match the following : 
      a) P-Z, Q-X, R-Y 
      b) P-X, Q-Z, R-Y 
      c) P-Y, Q-X, R-Z 
      d)P-Z, Q-Y, R-X 
3     The key issues which are documented in a project plan are : 
      a) project operating budget, project logic diagram, estimates , balanced cost 
      b) project operating budget, project logic diagram, estimates, minimized cost 
      c) project operating budget, project logic diagram, estimates, maximized cost 
      d) project operating budget, project logic diagram, estimates, updated risk log 
4     Bottom up approach in estimation consists of the following : 
      a) project manager first divides the product under development into modules, each module 
      further subdivided in to smaller units, defines a standard for manufacturing and self testing 
      b) project manager reviews each  module, each module further subdivided in to smaller units, 
      defines a standard for manufacturing and self testing 
      c)project manager   reviews each module, each module is planned,      defines a standard for 
       manufacturing and self testing 
      d) project manager reviews each module, each module is planned,                defines a standard for 
       manufacturing and self testing 
5     The key issues which are documented in a project plan are : 
      a) project operating budget, project logic diagram, estimates , balanced cost 
       b) project operating budget, project logic diagram, estimates, minimized cost 
      c) project operating budget, project logic diagram, estimates, maximized cost 
      d) project operating budget, project logic diagram, estimates, updated risk log 
6     Top down approach in estimation consists of the following : 
      a) Prepare the budget, fix the productivity level for the project, and obtain the overall effort 
      estimate from the productivity and size estimates. 
       b) get the estimate of the total size of the product in function points, fix the productivity level for 
      the project, obtain the overall effort estimate from the productivity and size estimates. 
      c) Prepare the budget, establishes the controls for the project, obtain the overall effort estimate 
      from the productivity and size estimates. 
      d) Prepare the budget, establish the controls for the project, monitor the controls set and obtain 
      the overall effort estimate from the productivity and size estimates. 
7      P) Build employee trust in the communications process so that hones feedback becomes a part 
      of the natural way of working is the only essential characteristic of a communication network. 
      Q) Quality of any product or service is defined as its conformance to the standards or the stated 
       requirements. Which of the following is correct: 
      a) Both are True 
       b) Both are False 
      c) P is True and Q is False 
      d) P is False and Q is True 
8      Match the following: 
       (p) define            (x)design of experiments, modeling 
       (q) improve          (y) control charts, time series, procedural adherence, performance mgmt. 
       (r) Standardize      (z) benchmark, customer requirement, process flow map, quality function. 
      Which of the following is correct? 
      a) p-x, q-y, r-z 
       b) p-y, q-x, r-z 
      c) p-z, q-y, r-y 
      d) p-z, q-x, r-y 
9     Consider the following statement: 
      P) An office is a small group of people which coordinates various activities responsible to an 
      enterprise for controlling at least one function. 
      Q) The PMO must create and maintain the ability of the project manager to keep focused on the 
      client’s requirements and meet them. 
      Which of the following is correct 
      a) Both are True 
      b) Both are False 
      c) P is True and Q is False 
      d) P is False and Q is True 
10    The four types of reviews conducted at different stages of the project are          : _______ , 
      _________ , ______ and _____ . 
      a) IR, PPR, PR, QAR 
      b) IR, TR, DR, QAR 
      c) AR, PR, SR, DR 
      d) DR, IR, PPR, QR 
11    Consider the following statement: 
      P) In PERT, we take into consideration the fact that the times allocated for all the activities 
      might be determinable. 
      Q) Project overruns are common and costly. 
      Which of the following is correct 
      a) Both are True 
      b) Both are False 
      c) P is True and Q is False 
      d) P is False and Q is True 
12    Match the following: 
      p) innovation           x) change in authority and task relationships of managers 
      q) e-engineering        y)  use all types of information systems to make functions efficient 
      r)  restructuring       z)  successful use of skill and resources 
      Which of the following is correct? 
      a) p-x, q-y, r-z 
      b) p-y, q-x, r-z 
      c) p-z, q-y, r-x 
      d) p-z, q-x, r-y 
13    The following statements are guidelines to help the organizations to strengthen their R & D area 
      P) The traditional way of technology development is carried out with corresponding link to the 
      product development of activities. 
      Q) Failures in the early stages of the projects are less costly and harmful than at later stages. 
      Which of the following is correct? 
      a) Both are True 
      b) Both are False 
      c) P is True and Q is False 
      d) P is False and Q is True 
14    The following statements are guidelines to help the organizations to strengthen their R & D area 
      P) Value goes on getting added along the supply chain. 
      Q) Inventory costs money has to be kept to the maximum for achieving total economy. 
      Which of the following is correct? 
      a) Both are True 
      b) Both are False 
      c) P is True and Q is False 
      d) P is False and Q is True 
15    Consider the following two statements : 
      P) Project Management Review Process for Corporate and Major Information Systems was 
      instituted to review all major information systems in development, enhancement, or production 
      of a product or a service. 
      Q) These reviews serve as a forum to raise issues and concerns that will impact the project and 
      ensure that acceptable actions or corrective plans exist for addressing any significant positive 
      impacts. 
      Which of the following is correct? 
      a) Both are true 
      b) Both are false 
      c)Statement     P is true and statement Q is false 
      d) statement P is false and statement Q is true 
16    The four steps to manage risk are: ___, ____, ____, and ____. 
      a) identification, analysis, management planning and review 
       b) identification , assessment, review, planning 
       c) planning, analysis, design, structure 
       d) planning, analysis, structuring and reviewing 
17     Consider the following statements : 
       P)The intent of this document is to define the structure of the Documentation System, its 
       content, the method of content generation and to attain common documentation of all standard 
       processes of Odette. 
       Q) The entry level of the process documentation structure is the function tree that shows the 
       hierarchic structure of the process documentations. 
       Which of the following is correct? 
       a) Both statements are True 
       b) Both statements are False 
       c) Statement P is True and Statement Q is False 
       d) Statement P Is False and Statement Q is True 
18     The main objective of SCMo are _________ . 
       a) Stock out, over supply, excess inventory, excess production, decreased supply demand ratio. 
       b) Prevention of stock out and over supply, early warning, elimination of bull whip effect, 
       optimized allocation. 
       c) Stock deterioration, losses, increased supply demand ration, minimized inventory. 
       d) Over distribution, excess production, maximimized inventory, minimizes wastages. 
19     The GDM is adopted by an Industry or Business to serve to any Customer Worldwide with 
       ________, _________, _________ and __________. 
       a) utility, productivity, serviceability, satisfiability 
       b) efficiently, satisfiably, reliability, conditionally 
       c) accountability, serviceablity, utility, productivity 
       d) speed, accuracy, economy, reliability 
20     Consider the following statements: 
       P) System Requirement covers a Remote Device Solution controlling Delivery of Media 
       Programs in Real Time Mode from the Achieves of the Media Centre to the TV Stations based 
       on a day to day program Schedule. 
       Q) Competitors offer two varieties of products – one for primary Hypertension Symptoms and 
       the other for advanced Symptoms, the latter priced at Five times the former. 
       Which of the following is correct? 
a) Both statements are True 
b) Both statements are False 
c) Statement P is True and Statement Q is False 
d) Statement P is False and Statement Q is True 
Without a good online project management a person lost in the sea of email correspondence from time to time
ReplyDelete